Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWestmill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Westmill Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Westmill Wind Farm (Wind , Active) Location in the UK : England, Watchfield, South Oxfordshire Type of installation: Wind on/offshore: on Turbines :5 Capacity : 6.5 MW Approx Date of 1st power generation: february 2008
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Westmill Wind Farm Co-op is the first onshore wind farm to be built in the south-east of England and is 100% Community Owned.
Work on the five turbine site at Watchfield, South Oxfordshire, started in August 2007 and was commissioned in March 2008. The wind farm produces enough green electricity to power more than 2,500 homes whilst saving the emissions of carbon dioxide.
The Cooperative's own site (wind and solar): http://www.weset.org/contact.htm For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Watchfield Airfield, Watchfield, Swindon. SN6 8TH
Relationship |
Company (For:
Westmill
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Westmill Wind Farm 6.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Oxfordshire Country: England LPA: Vale of White Horse District Council
|
Site ID and Reference: |
3264 / N00386W
District:
|
Applicant: |
Private Developer
Application :
WAT/1611/9/00
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
6.5 |
Site Address: |
Westmill Farm
, Highworth Road
, Watchfield
, Swindon
, Oxon
|
|
SN6 8TH
|
County: |
Oxfordshire Region: South East
|
OS Coordinates: |
423218 / 423218
|
Development Status: |
Operational
|
Application Submitted: |
9/1/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2008
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Westmill Wind Farm (19/02/2008) - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00190RQEN
|
Capacity: |
6500
|
Status: |
Live
|
Accreditation Date: |
9/1/2000
|
|
|
Commission Date: |
1/1/2008
|
|
|
Applicant: |
Westmill Wind Farm Co-operative Ltd
|
Applicant Address: |
Unit 33
Trinity Enterprise Centre
Furness Business Park Cumbria
LA14 2PN
|
Address: |
Westmill Wind Farm (19/02/2008) - A
Westmill Wind FarmWatchfieldSwindonOxfordshi
SN6 8TH
England
|
Capacity: 13 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/6/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|